Thursday, August 20, 2026
The Daily Minneapolis

Local News, Minneapolis. Every Day.

Multiple Sources. Transparent Technology.

news

Minneapolis Replaces Buses, Updates Routes During Major Roadwork

Local services adjust transit operations and provide tools for drivers to navigate changes on key routes.

By Minneapolis News Desk · Published July 24, 2026

Listen in English · 3 min

How we reported this

This article was written by AI from the linked sources and was not reviewed by a journalist before publishing. The Daily Minneapolis is part of The Daily Network and follows our reasonable editorial care.

Buses are replacing METRO Blue Line trains at all stations until August 20, with METRO Green Line services also using replacement buses during specific July and August dates. New traffic impacts on I-394 began July 8, 2026, and will continue through November due to construction, including overnight lane closures from bridge work.

Transit Service Adjustments

The city is addressing rail service interruptions by deploying replacement buses across the METRO Blue Line network. This measure covers every station on the line and extends to targeted periods on the METRO Green Line. Officials have timed the changes to maintain connectivity while infrastructure work proceeds, directing riders to monitor updates through established transit channels.

These bus substitutions form part of the city's response to temporary rail limitations. The approach allows continued movement along affected corridors without relying solely on rail infrastructure during the specified window.

Highway Construction Impacts

Construction on I-394 has introduced new traffic patterns starting July 8, 2026, with work scheduled to run through November. Bridge projects are driving overnight lane closures as part of broader infrastructure efforts. These steps reflect decisions to advance maintenance while managing flow on a major route through Minneapolis.

Drivers encounter altered conditions tied directly to the ongoing projects. The timeline provides a defined period for planning around the disruptions rather than indefinite restrictions.

Accessing Current Information

Minneapolis maintains an interactive road closures map that is updated regularly to reflect current projects and events. Residents and commuters can access the tool through the city's official website to check real-time status on routes including I-394. This resource supports decisions about travel timing and alternatives during the construction phase.

The map serves as a central point for details on both highway work and any related transit effects. By consulting it, users obtain the latest available data on closures without needing additional verification steps.

Combined with the bus replacements, these measures show how local services are coordinating responses to simultaneous transit and road challenges. The congestion level stands at 28.3 percent on average, 1.8 percentage points higher than in 2024, with rush-hour speeds averaging 39 km/h. Checking the map before trips offers one practical step for navigating the period ahead.

References Sourced but Not Limited to:

Beta · AI-assisted · human oversight

Your newsroom. Shaped by you.

The Daily Minneapolis is in beta. AI may assist with research, summarising and drafting. Automated checks assess sourcing, accuracy and editorial risk before publication, and sensitive material is held for human review. Spotted something off, or want us covering a topic? Tell us. Your feedback is entirely optional and helps shape what we publish next.

The Daily Network · local news across USA